BRIDGES are set to swing for longer than usual.
Two bridges in Northwich town centre will swing later this week, the Canal and River Trust has confirmed.
Hayhurst Swing Bridge will swing first, at 9.30am on Thursday (July 25).
This will be followed by Northwich Town Swing Bridge, at 10.30am.
The CRT has said that these swings would usually take five minutes.
However, on this occasion, it could take as long as 20 to 30 minutes.
This is likely to cause some disruption for motorists travelling on Chester Way.
Comments: Our rules
We want our comments to be a lively and valuable part of our community - a place where readers can debate and engage with the most important local issues. The ability to comment on our stories is a privilege, not a right, however, and that privilege may be withdrawn if it is abused or misused.
Please report any comments that break our rules.
Read the rules here